GDeck makes block and beam floor installation faster and easier for groundworkers by replacing heavy traditional infill blocks with lightweight EPS components. Designed to reduce manual handling while maintaining the proven concrete beam construction method, GDeck helps teams install insulated suspended floors more efficiently on site.
GDeck is a groundworker beam and block floor system designed to make suspended beam and block flooring faster, safer and easier to install. Combining pre-stressed concrete beams with lightweight EPS rails and infill panels, this insulated beam and block floor system removes unnecessary installation steps while delivering excellent thermal performance and Part L compliance.
Faster Beam and Block Installation
Groundworkers need a beam and block floor system that keeps projects moving. GDeck delivers faster beam and block installation by eliminating unnecessary top sheet insulation, reducing cutting on site and creating a stable working platform from the moment installation begins. As a modern block and beam alternative, GDeck helps reduce labour while improving programme certainty:
Panels and rails are connected making installation even easier.
Unique white **multi-**rail eliminates the need for returning and concreting between double beams.
Installs in a single operation with no additional top sheet insulation required.
A strong, stable walking platform compared to other EPS systems.
Minimal cutting required, no mechanical saws, and no silica dust.
Safer, cleaner, and more efficient working conditions.
A Stronger Concrete Floor Beam System
Unlike traditional suspended beam and block flooring, GDeck creates a strong, insulated platform using a connected concrete floor beam system with integrated EPS rails and infill panels. The result is a safer installation process with fewer manual handling risks and improved structural performance.
Weighing just 2.4kg per EPS panel, GDeck is a lightweight beam and block flooring solution that’s up to 98% lighter than traditional concrete infill blocks. This EPS beam and block flooring system significantly reduces manual handling, installer fatigue and lifting requirements, helping groundworkers improve productivity while creating a safer working environment.
No heavy lifting – reduces fatigue and manual handling risks.
Easy to transport and position on site.
Cuts installation time while protecting your workforce.
Faster installs mean reduced labour costs and better efficiency.
Lightweight handling keeps your teams safer and fresher on site.
Simpler logistics with reliable delivery times.
GDeck doesn’t just make floors quicker, it makes your work more profitable and less stressful.
Deliver Part L compliant homes with improved thermal performance, reduced structural loads and faster installation.
Specify a compliant suspended floor system with confidence. Access detailed beam and block floor details, U-values, load data and technical support.
Explore the lightweight EPS infill blocks and components behind GDeck’s insulated block and beam floor system.